We produced another steel structure for unwinding and production of packaging films, this time determined for France. Our delivery included static analysis, manufacturing and pre-assembly.

Total weight: 26 t

Date: July 2016
Category: Investment constructions

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Supporting Structure for Film Production

Více

TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více