We have carried out a pre-assembly of the gas turbine structure for GE. It was the pre-assembly check for a final functional and quality control before the surface treatment is carried out.
The total weight of the produced steel construction for one turbine is 35 t.
Date: April 2016
What they say about us
“ We were very happy with the technical solution and the delivery of technological and supporting steel structures for the hydrogen production units by the company TMETAL. We are looking forward to continued cooperation. “
Petr Pazdera, ZVU Engineering a.s., Hradec Králové