Our assembly team has installed a new footbridge over the river Ondřejnice in Fryčovice. This nine-ton steel footbridge with a length of 28 m was designed and manufactured by TMETAL according to the requirements of the municipality. We are glad that we could contribute to the local development.

Date: October 2020
Category: Buildings for industry and civic amenities

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel Structures for the Sports Hall in Frenštát pod Radhoštěm

Více

Steel Footbridge under the Road Bridge in Trojanovice

Více