Our assembly team has installed a new footbridge over the river Ondřejnice in Fryčovice. This nine-ton steel footbridge with a length of 28 m was designed and manufactured by TMETAL according to the requirements of the municipality. We are glad that we could contribute to the local development.
Date: October 2020
Category: Buildings for industry and civic amenities
Category: Buildings for industry and civic amenities
What they say about us
“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “
Adolf Dolák, Windmöller & Hölscher Prostějov k.s.