We performed a test pre-assembly of the structure for the equipment for the production of foils: 154 tons of steel with a surface of almost 5000 m2. Everything is verified, so it can be dismantled, painted, packed and taken to the customer in Germany.

Date: September 2021
Category: Investment constructions
Destination country: Germany

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.