Everything fits. Our installers checked the correctness of the drawings and production during the control pre-assembly of this tower, which will be installed by an Italian customer.

Date: July 2023
Category: Investment constructions
Destination country: Italy

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Supporting Structure for Film Production

Více

TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více