Steel structure for film production technology, which we pre-assembled at our facility before applying surface protection to ensure everything fits perfectly at the final customer’s site in Brazil. TMETAL’s delivery includes the production of the steel structure with a total weight of 80 tons, including engineering, surface protection, and transportation to the port.

Date: May 2024
Category: Investment constructions
Destination country: Brazil

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více