Production of steel construction for foil extrusion machine. Delivery included engineering as well as supervision during the erection of the steel structure in Germany. Total weight: 97 tons

Date: February 2018
Category: Investment constructions
Destination country: Germany

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Supporting Structure for Film Production

Více

TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více