We have successfully completed the installation of the footbridge for pedestrians and cyclists under the road bridge in Trojanovice. The suspended steel footbridge with railings and composite grates was manufactured at TMETAL. On Saturday, it underwent its first load test in the form of the Kopřivnice Drtič cycling marathon, with hundreds of mountain bikers passing through.

Date: July 2024
Category: Buildings for industry and civic amenities
Destination country: Czech Republic

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Steel Structures for the Sports Hall in Frenštát pod Radhoštěm

Více

Steel construction for indoor skydiving in Poland

Více