We produced a steel structure of compact wall parts for covering a GE gas turbine. The walls are prepared in the manufacturing process, including insulation, and only a simple assembly of large-scale segments follows on site. TMETAL did not want to stand aside to this possible future production trend, even though it demands lots of space, difficult manipulation and complicated logistics. The test pre-assembly and overseas packaging was part of our supply.
Photos from the pre-assembly of a structure designed to soundproof the gas turbine – wall panels with insulation for two units. The structures are 10 m resp. 8 m high.
Total delivery weight 240 t.
Category: Structures in power generation
Destination country: Algeria
What they say about us
“ We were very happy with the technical solution and the delivery of technological and supporting steel structures for the hydrogen production units by the company TMETAL. We are looking forward to continued cooperation. “
Petr Pazdera, ZVU Engineering a.s., Hradec Králové