Pre-assembly of the steel structure of the tower for the production of foils intended for a customer in Brazil. A total of 48 tons.

Date: September 2022
Category: Investment constructions
Destination country: Brazil

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Supporting Structure for Film Production

Více

TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více