All details checked, connections and design perfect. Railing pieces were bent on our new emob63 tube bending machine. The tower is ready for disassembly and transport to the paint shop and subsequently to the customer in Germany, where technologies for the production of foils will be installed in the steel structure.

Total weight: 47t

Date: August 2020
Category: Investment constructions
Destination country: Germany

What they say about us

“ We are very satisfied with the delivery of multi-function construction for the assembly of machines MULTINIP with side bearings. The technical solution met our demanding expectations. We thank you and look forward to continuing our good cooperation. “

Adolf Dolák, Windmöller & Hölscher Prostějov k.s.


Supporting Structure for Film Production

Více

TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více