Steel structure for film production technology, which we pre-assembled at our facility before applying surface protection to ensure everything fits perfectly at the final customer’s site in Brazil. TMETAL’s delivery includes the production of the steel structure with a total weight of 80 tons, including engineering, surface protection, and transportation to the port.

Date: May 2024
Category: Investment constructions
Destination country: Brazil

What they say about us

“ We were very happy with the technical solution and the delivery of technological and supporting steel structures for the hydrogen production units by the company TMETAL. We are looking forward to continued cooperation. “

Petr Pazdera, ZVU Engineering a.s., Hradec Králové


TMETAL Steel Structures for the Construction of the Lyon-Turin Tunnel

Více

Pre-assembly of the steel structure

Více